Since George’s passing, GLH has upgraded their Willawong maintenance facility with construction of a state of the art 5 bay workshop, hard stand and wash down facility, along with Quality Assurance certification to AS9001 and Health & Safety AS4801.

George’s Loader Hire can proudly claim to have played a major part in every rail construction project in Queensland in the last ten years including Corinda to Darra, Darra to Richlands, Richlands to Springfield, Cavill Ridge, Middlemount, Moreton Bay Rail – Petrie to Redcliffe, the SEQ Stabling Yard project and Gold Coast Light Rail Stage 2.

We are engaged on an on-going basis to  perform general rail maintenance tasks such as re-sleepering, refurbishments, re-railing, level crossings, services, component changes, drainage, undercutting.  Our 13 tonne modified and height limited Hitachi Undercutter was the first on-line in the South East network and our purpose built tampers have tamped thousands and thousands of hours.

GLH has served the civil industry and general materials handling industries in many capacities.  Our loaders are utilised in concrete plants, recycling plants, roads, gas fields,  refuse centres and in clean ups after floods and storms.